Module 9 of 9 · A6 · Worked example and the communication template

1.The example installation

Two production processes:

  • Process 1, primary smelting: alumina and anodes in; ingots (sold) and slabs (to process 2) out.
  • Process 2, forming: slabs in; wire, sheet and foil out, plus scrap sold.

Because ingots are sold, a joint "bubble" process is not allowed. The forming products differ only in size or shape, so they form one process.

Item Quantity
Unwrought aluminium, total 200 000 t
of which ingots sold 80 000 t
of which slabs to process 2 120 000 t
Wire / sheet / foil 45 000 / 60 000 / 8 000 t
Total aluminium products 113 000 t
Scrap sold (not a CBAM good) 7 000 t
Electrodes consumed (net of stumps) 69 000 t
Natural gas 14 181 t (12 219 t process 1, 1 962 t process 2)

Sources: G5e §4 p.23-24, Figure 4-1, Table 4-1 p.27; MA Art 4(9), Annex II A.4.